We have successfully implemented several projects in coordination with specialist system suppliers around the globe.
Few of our recently completed major projects are listed below.
List of Other Significant Projects in the Past
•Supply and installation Teflon Umbrella Structure from M/S SONDERKONSTRUKTIONEN UND LEICHTBAU Gmbh (SL) – Germany for the Yayasan project. |
•Supply and installation of Telescopic Platform with M/S CLEVELAND TRAMRAIL – Luxembourg for Sultan’s Hangar – a joint venture project. |
•Supply of and Installation Paqua lab System 50 from M/S ELE INTERNATIONAL for Foundation Engineering. |
•Supply and Installation of EIMAC Valve from M/S RICHARSON ELECTRONIC for Radio Television Brunei. |
•Supply, installation and commissioning of Satellite (GMS-5 & NOAA) Reception System from M/S UKW Technik – Germany for Department of Civil Aviation – Meteorological Section. |
•Supply of Travelling wave tube (TWT) and associated spares for Watchman Primary Surveillance Radar System from M/S MIL-LION TECHNOLOGIES for Department of Civil Aviation. |
• Supply, installation and commissioning of Open Path Gas Detection System from M/S DRAEGER – Germany for Brunei Shell Petroleum Company. |
•Supply and Installation of Oil Spill Equipments from M/S RO-CLEAN DESMI A/S, DENMARK for Brunei Shell Petroleum Company. |
•Supply and Installation of Oil Spill Containment, Booms, Skimmers and Tanks from M/S ACTION PETROLEUM SPILL RECOVERY, INC. – USA for Brunei Shell petroleum Company. |
•Supply, Install & Commissioning of Weather Station Network with Central Monitoring for Brunei Meteorological Section. |
•Beacon Lighting for Brunei International Airport from MANAIRCO – USA. |
•Supply, installation and commissioning of Titration System at Fish Landing from GERHARDT – Germany; Muara – Fisheries Department. |
Older Projects by Chronological Order
Project Description | Location/Client | Year of Completion |
---|---|---|
Upgrading of Network Operations Centre | Telecom Brunei Berhad | 2017 |
CNS-ATM(Communication, Navigation, Surveillance & Air Traffic Management System) system(includes CCTV system at 4 remote sites and centralized monitoring) | Brunei International Airport/DCA | 2016 |
Supply & Installation of CCTV system for Shell Aviation facilities for BSP | Shell Aviation, BSP | 2015 |
Supply & Install Flight Information Display System(FIDS) & Public Address System | Brunei International Airport, BEDB/TRC | 2014 |
Supply & install PABX & Telephony System | Brunei International Airport, BEDB/TRC | 2014 |
Supply & install Time Distribution System | Brunei International Airport, BEDB/TRC | 2014 |
Supply & install of X-Ray screening system for access gates | Brunei International Airport, DCA | 2013 |
Supply & installation of Audio Visual System, stage lighting & rigging system for new PMO complex | HSE Engineering, S/B/UE/PMO | 2013 |
Supply & installation of Mono-Pulse Secondary Surveillance Radar System (MSSR) | Brunei International Airport, DCA | 2012 |
Supply & installation of 5 units of Visual Docking & Guidance System & Gate Operating System (AGSS) | Brunei International Airport, DCA | 2011 |
Supply & installation of Voice Recording System for Air Traffic Control Center | Brunei International Airport, DCA | 2011 |
Supply & installation of Primary Surveillance Radar System(PSR) & Air Traffic Control Center (Eurocat) (Includes CCTV system with remote monitoring) | Brunei International Airport, DCA | 2009 |
Supply & installation of Instrument Landing System/Distance Measuring Equipment (ILS/DME) | Brunei International Airport, DCA | 2009 |
Supply & Installation of Aircraft Fire Training Simulator System | Brunei International Airport, DCA | 2008 |
The Supply, installation & commissioning of a new system to replace the existing automatic weather observation system (AWOS) network | Brunei International Airport, DCA | 2004 |
The Supply, installation & maintenance of a System for Lightning Data Acquisition, Monitoring & Tracking (SLAMaT) Network | Brunei International Airport, DCA | 2004 |
The Supply, installation & commissioning of a Complete Doppler Very High Frequency Omni-Directional Range System/Distance Measuring Equipment (DVOR/DME) | Brunei International Airport, DCA | 2003 |
Supply & installation of Satellite Distribution Centre | Brunei International Airport, DCA | 2002 |
Supply & installation of Flight Information Display System (FIDS) | Brunei International Airport, DCA | 2001 |
Supply & installation of Aerobridge (PBB) | Brunei International Airport, DCA | 2001 |
Supply & installation of Time Distribution System(First Mosar Baer system was supplied in 1985 and DCA gave us a repeat order in 2001 as they were comfortable with the system) | Brunei International Airport, DCA | 2001 |
Supply & installation of Docking and Guidance System(all the 8 DGS systems in Brunei Airport are supplied by ESC in phase 1 and 2 upgrades) | Brunei International Airport, DCA | 2001/1996 |
Supply, installation and commissioning of 4KW NDB | Brunei International Airport, DCA | 1999 |
Supply and installation of Airfield Lighting, Control & Monitoring System(Complete runway lighting & control/monitoring systems are supplied by ESC in different project phases) | Brunei International Airport, DCA | 1998/2002 |